PCB + PCBA design and manufacturing

From your requirements to PCB and PCBA delivery.

Tell us what your board needs to do. Our engineering and production teams develop the design, prepare a quotation and manufacture the boards to your agreed requirements.

Concept visuals of engineering, production and inspection.

Workshop context

Inside the workshop.

Workshop photographs showing SMT equipment, PCB processing and final assembly.

  1. Requirements to design

    From brief to board

    Start with clear functions and specifications. Our engineering team develops the design and quotation; a complete BOM is not required to begin.

  2. Design and sourcing

    DFM and BOM review

    We review design for manufacturing (DFM), the bill of materials (BOM) and component options before a build.

  3. Build validation

    Prototype and NPI

    We plan prototypes for new product introduction (NPI) and review open questions with you before production.

  4. Controlled handoffs

    Production and delivery

    We plan production, inspection and delivery around your confirmed requirements.

From requirements to delivery

We confirm the requirements with you, develop the design and prepare the boards for production.

  1. Starting material

    Share what you have

    Bring the use case, project stage, target volume, and the material already available.

    Product photograph.
  2. Engineering review

    Develop the design

    Our engineering team develops the design, engineering files and quotation around your requirements.

    Concept visual of an engineering review.
  3. Build decision

    Quote and validate

    Align the quote and early validation work before the next commitment.

    Concept visual of build validation.
  4. Project handoffs

    Plan production and delivery

    Our production and quality teams manufacture and inspect the boards to the confirmed requirements before delivery.

    Photograph of a final assembly workshop.
Product photograph.

Quality records to review

We agree the quality records and their coverage with you for each project.

Product photograph of a round power control board
Product photograph. Quality records are provided within the agreed project scope.
  1. Incoming material

    We define receiving and material checks for your project.

  2. Process inspection

    We document process inspections within the agreed build plan.

  3. Functional or programmed test

    We provide records for the functional or programming checks included in the project.

  4. Lot and production traceability

    We agree lot identification and production traceability records with you.

Start with what you have

Let’s discuss your next build.

Clear requirements or an existing design. Tell us the functions, specifications and quantities you need.

Discuss your board project